3 function description (pulse-time diagram) – Festo Электромотор MTR-DCI User Manual

Page 104

Advertising
background image

5. Commissioning

5-26

Festo P.BE-MTR-DCI-IO-EN en 1209d

5.4.3

Function description (pulse-time diagram)

Switch-on and homing run

Start-up reaction

In order to guarantee that the system starts correctly, all
input signals must be stable when the power supply is
switched on (min. 1 s). After this the input signals are
scanned:

If a fault occurs when the device is switched on, the START
signal

>

1 will not be observed until the FAULT signal is

cancelled.

If there are no faults and the enable is active (ENABLE signal
= 1), the controller reports readiness for operation, i.e.
(READY signal

>

1 and MC signal =1 (Motion Complete).

Start homing run

If there are no faults and enable is active (ENABLE = 1), hom-
ing run (input word I1 ... I4 = 1, positive edge at START input)
can be carried out. When the START signal is set (

> 1), the

MC signal is reset (

> 0) and the drive carries out homing

run.

Disable

Homing run can be discontinued like any position set with a
falling edge at the ENABLE input (

>

0).

Fault

If homing run is discontinued by a cancelled ENABLE signal or
a fault, the controller will set internally the FAULT signal (

>

1,

HOMING ERROR). The MC signal and the READY signal will be
reset

>

0.

Advertising