3 start-up flowcharts, Start-up flowcharts – Yaskawa J1000 Compact Vector Control Drive User Manual

Page 90

Advertising
background image

4.3

Start-up Flowcharts

The flowcharts in this section summarize basic steps required to start the drive. Use the

flowcharts to determine the most appropriate start-up method for a given application. The

charts are intended as a quick reference to help familiarize the user with start-up procedures.

Flowchart

Subchart

Objective

Page

A

Basic startup procedure and motor tuning.

91

A-1

Simple motor setup with Energy Savings or Speed Search using V/f mode.

92

A-2

High-performance operation using Open Loop Vector (OLV) motor

control.

93

A-3

Operation with Permanent Magnet (PM) motors.

94

-

Setup of drive using application specific selections.

Refer to Application

Selection on page 96

.

-

4.3 Start-up Flowcharts

90

YASKAWA ELECTRIC TOEP C710606 47C YASKAWA AC Drive – V1000 Quick Start Guide

Advertising