4 uldp troubleshooting, Uldp, Roubleshooting – PLANET WGSW-52040 User Manual

Page 102

Advertising
background image

SwitchA(Config-If-Ethernet1/1)#exit

SwitchA(config)#interface ethernet 1/2

SwitchA(Config-If-Ethernet1/2)#uldp enable

Switch B configuration sequence:

SwitchB(config)#uldp enable

SwitchB(config)#interface ethernet1/3

SwitchB(Config-If-Ethernet1/3)#uldp enable

SwitchB(Config-If-Ethernet1/3)#exit

SwitchB(config)#interface ethernet 1/4

SwitchB(Config-If-Ethernet1/4)#uldp enable

As a result, port g1/1, g1/2 of SWITCH A are all shut down by ULDP, and there is notification

information on the CRT terminal of PC1.

%Oct 29 11:09:50 2007 A unidirectional link is detected! Port Ethernet1/1 need to be

shutted down!

%Oct 29 11:09:50 2007 Unidirectional port Ethernet1/1 shut down!

%Oct 29 11:09:50 2007 A unidirectional link is detected! Port Ethernet1/2 need to be

shutted down!

%Oct 29 11:09:50 2007 Unidirectional port Ethernet1/2 shutted down!

Port g1/3, and port g1/4 of SWITCH B are all shut down by ULDP, and there is notification

information on the CRT terminal of PC2.

%Oct 29 11:09:50 2007 A unidirectional link is detected! Port Ethernet1/3 need to be

shutted down!

%Oct 29 11:09:50 2007 Unidirectional port Ethernet1/3 shutted down!

%Oct 29 11:09:50 2007 A unidirectional link is detected! Port Ethernet1/4 need to be

shutted down!

%Oct 29 11:09:50 2007 Unidirectional port Ethernet1/4 shutted down!

10.4 ULDP Troubleshooting

Configuration Notice:

In order to ensure that ULDP can discover that the one of fiber ports has not connected

or the ports are incorrectly cross connected, the ports have to work in duplex mode and

have the same rate.

If the automatic negotiation mechanism of the fiber ports with one port misconnected

10-24

Advertising