Chapter 5: hardware installation overview, Preparing for installation – Meridian America Link/Customer Controlled Routing User Manual

Page 105

Advertising
background image

87

Meridian Link Release 5C/CCR Release 3C Installation and Upgrade Guide

Chapter 5: Hardware installation
overview

Preparing for installation

As soon as the IPE Module or Application Module is delivered, make sure
that all deliverable items are present by checking them against the packing
slips. Move the equipment to its permanent location before beginning the
installation.

Ensure that you have the following tools available:

¥

antistatic wrist strap

¥

BIX connector tool (NT product number GYBIX16)

¥

carpenterÕs level

¥

extraction tool (P0741489)

¥

hammer

¥

Phillips screwdriver (small, medium)

¥

slotted screwdriver (small, large)

¥

socket

¥

wrenches (1/4, 5/16, and 9/16 in.)

¥

volt meter

¥

wire cutters

¥

wire strippers

Advertising