Chapter 8: hardware installation procedures – Meridian America Link/Customer Controlled Routing User Manual

Page 137

Advertising
background image

119

Meridian Link Release 5C/CCR Release 3C Installation and Upgrade Guide

Chapter 8: Hardware installation
procedures

!

CAUTION

Risk of data loss

Ensure that the breaker switch on the AEM is in the Off
position before following the procedures for installing an
Application Module.

You should use this chapter in conjunction with Chapter 5, ÒHardware
installation overview,Ó which links hardware installation procedures in
easily understood tables (Tables 11 and 12).

This chapter provides information on the installation of the IPE Module
(Option 11 and Options 21Ð81) and the Application Module hardware
components. High-level installation procedures for all three hardware
options are followed by procedures for installing components.

ATTENTION

Before proceeding with any hardware installation, upgrade, or update,
ensure that all discrepancies found in Chapter 6, ÒSite survey/
installation checklistÓ have been corrected.

Advertising