Meridian America Link/Customer Controlled Routing User Manual

Page 139

Advertising
background image

Chapter 8: Hardware installation procedures 121

Meridian Link Release 5C/CCR Release 3C Installation and Upgrade Guide

Table 28
Default DCE/DTE settings

Port

Setting

Use

1

DCE

Console

2

DCE

Modem

3

DTE

Conshare

4

DTE

Meridian Mail Link

5

DTE

AML

6

DCE

Terminal/printer (CCR)
X.25 Host Link (Meridian Link)

7

DCE

Terminal/printer

8

DCE

Terminal/printer

Refer to Figure 30 (Part 2) for a diagram of the correct jumper
settings. To change the configuration of a port after you have
installed an IPE Module, you must remove the IPE Module from the
Meridian 1 IPE Shelf or Option 11 cabinet. For more information on
DCE and DTE, refer to Chapter 11, ÒPeripheral device cabling
interface.Ó

!

CAUTION

Risk of data loss

Do not install the IPE Module if the IPE Module power
push button is in the On position.

2

Choose where you want to install the IPE Module. An Option 11
IPE Module occupies three consecutive slots in an Option 11
cabinet. An Options 21Ð81 IPE Module occupies four consecutive
slots on an IPE shelf. For more information, refer to Chapter 4,
ÒMeridian Link/CCR hardware.У

Advertising