Meridian America Link/Customer Controlled Routing User Manual

Page 199

Advertising
background image

Chapter 9: Meridian Link/CCR interface cabling 181

Meridian Link Release 5C/CCR Release 3C Installation and Upgrade Guide

4

Connect the NT1R03CA extension cable that is connected to the
NT1R03BA octopus cable to the appropriate connector as shown in
Tables 58 and 59. For example, if the IPE module is located in slots
2, 3, and 4, connect the extension cable to connector J2.

Table 58
Option 11 IPE ModuleÑNTIR03BA/NT1R03CA cable connection
(main cabinet)

Slots occupied by the

IPE Module

Connect NT1R03BA/NT1R03CA

cables to connector port

2, 3, 4

J2

3, 4, 5

J3

4, 5, 6

J4

5, 6, 7

J5

6, 7, 8

J6

7, 8, 9

J7

Table 59
Option 11 IPE ModuleÑNT1R03BA/NT1R03CA cable connections
(expansion cabinet)

Slots occupied by the

IPE Module

Connect NT1R03BA/NT1R03CA

cables to connector port

11, 12, 13

J11

12, 13, 14

J12

13, 14, 15

J13

14, 15, 16

J14

15, 16, 17

J15

16, 17, 18

J16

17, 18, 19

J17

18, 19, 20

J18

Advertising