IAI America ASEL User Manual

Page 25

Advertising
background image

Part 1 Installation

Chapter 1 Overview

3

Part 1 Installation

This controller can be configured with one axis and two axes. Just like other conventional SEL controllers,

this controller can be combined with various actuators. When connecting an actuator, be sure to use a

dedicated cable.

x

Turn on the I/O power before or simultaneously with the main power (control power + motor power).

x

Take the control power and motor power from the same power supply and turn on both powers

simultaneously.

x

Before performing a check or inserting/removing a connector, turn off the power and wait for at least 10

minutes.

x

About actuator duty

IAI recommends that our actuators be used at a duty of 50% or less as a guideline in view of the

relationship of service life and accuracy:

Duty (%) =

Inactivity

time

Motion

Time

on

Decelerati

/

on

Accelerati



X 100

x

After turning off the control power, be sure to wait for at least 5 seconds before turning it back on.

x

Do not insert or remove connectors while the controller power is on. Doing so may cause malfunction.

The following steps must be taken to initialize the absolute-data backup battery circuit to prevent the

battery from being consumed quickly. Perform the initialization by following these steps:

[1] Before connecting the encoder cable, disconnect the absolute-data backup battery connector.

[2] Connect the encoder cable.

[3] Turn on the main power.

[4] Connect the absolute-data backup battery.

The above steps must always be performed after the encoder cable has been disconnected for any

reason, such as to move the controller.

Read the operation manual for each actuator. If you have purchased our optional PC software and/or

teaching pendant, read the respective operation manuals, as well.

* Utmost effort has been made to ensure that the information contained in this manual is true and

correct. However, should you find any error or if you have any comment regarding the content,

please contact IAI.

x

Note on introducing a controller of absolute specification

Advertising