1 power on sequence, 2 power cutoff sequence – IAI America ASEL User Manual

Page 71

Advertising
background image

Part 1 Installation

Chapter 4 Operation

49

Part 1 Installation

1.1

Power ON Sequence

x

Although separate inputs are provided for the control power and motor power, they should be supplied

from the same power-supply terminal.

x

Turn on the PIO power first. You can turn on the PIO power much earlier than the control power and

motor power, as long as it is turned on before the control power/motor power.

* If the PIO power is not turned on before the control power is turned on, an error will be detected.

1.2

Power Cutoff Sequence

x

If the PIO power is turned off before the control power and motor power (before the power cutoff

processing is performed), a PIO power error may be logged internally by the controller.

x

The PIO power can be turned off much later than the control power and motor power, as long as it is

turned off after the control power/motor power.

Taken from the

same power supply.

Control power

Motor power

Controller status

Must be turned

on first, as a

rule.

PIO power

The PIO power must be turned on

before the control power, in order

to perform checks during

initialization and self-diagnosis and

apply a hardware latch upon

detection of an error.

Must be turned on

simultaneously, as a rule.

Initialization/self-diagnosis

Normal operating condition

Control power

Motor power

Controller status

PIO power

Once the control power

drops to approx. 19 V or

below, the power cutoff

processing is started.

Must be turned off

simultaneously, as a rule.

Power cutoff processing

If the PIO power is

turned off during this

period, an error may

be logged internally by

the controller.

Advertising