Operation position i/o assignments, Operation flow chart – IAI America ASEL User Manual

Page 279

Advertising
background image

Chapter 7

Application Program Examples

Part 2 Programs

257

Part 2 Programs

(2) Explanation of the operation

[1] The XY-table moves to the operation home (P1) and waits.

[2] The operator sets a load on the XY-table and turns on the start switch.

[3] The load riveting position No. 1 (P2) moves to the riveting position on the XY-table, and a

riveting command is output to the riveter.

[4] When the riveter completes the riveting operation and a completion signal is input, riveting

position Nos. 2 (P3) and 3 (P4) move to the riveting position in the same manner.

[5] When all three points have been riveted, the table will return to the operation home.

The above operation will be repeated. The operation position, external I/O assignments and

operation flow chart of this operation are shown below:

Operation Position

I/O Assignments

Category I/O No.

Signal name

Specification

16

Start command

Pushbutton switch

Input

17

Riveting

completion

Contact signal

Output 307 Riveting

command

24 VDC

AS

EL

* Flag is used from 600.

P1

(Operation

home)

Riveter position

Load

XY-table

Operation Flow Chart

Start

Move to position No. 1

Load counter = 2

Start

Move to riveting position

Riveting command ON

Riveting

complete

Riveting command OFF

Load counter + 1

Operation

complete

N

N

Y

Y

N

P3

P2

P4