4 checking the configuration, 3 checking the configuration -14 – Nortel Networks 8000 User Manual

Page 154

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

6 PPP and MP configuration

Nortel Secure Router 8000 Series

Configuration -WAN Access

interface interface-type interface-number

The interface view appears.

Step 3 Run:

ppp mp virtual-template number

The command binds the interface to an existing VT.

When using a VT to bind an interface, consider the following items:

Physical interfaces must be bound into one VT in the same mode.

All physical interfaces in one VT must be at the same interface board as the SR8000
does not support trans-board MP binding.

Number of the physical interfaces bound in one VT that are used to interwork at two

ends must be the same.

Multiple physical interfaces are bound in one local VT. The peer interfaces directly
connected to those physical interfaces must be bound into one VT.

Step 4 Choose one of the following methods to restart the interface.

Run the

shutdown and undo shutdown commands.

Run the

restart command.

When the interface is bound to the virtual interface template:

If the LCP of the physical interface in the Opened status, you must run the shutdown and

undo shutdown commands or run the restart command on the physical interface to restart
the interface, so that the LCP negotiation is re-enabled to ensure that the physical

interface is successfully bound to the MP.

If the LCP negotiation on the physical interface fails and is still in the negotiation stage,

you need not restart the physical interface.

CD NOTE

To ensure that the physical interface is bound successfully to an MP, it is recommended to restart all the

physical interfaces after all the bindings are configured.

—End

After running the

undo ppp mp command succeeds in the interface view, the MP binding is

deleted on the interface. At this time, you need not to restart the interface because the PPP

protocol can carry out auto-negotiation till the link layer status of the interface turns Up.

There are about 40 seconds from running the command to the Up status of the link layer

protocol.

6.6.4 Checking the configuration

Run the following commands to check the previous configuration.

Action

Command

Check the status of the specified

VT.

display interface virtual-template [

number

]

Check the information about the

MP binding.

display ppp mp [ interface

interface-type

interface-number

]

6-28

Nortel Networks Inc.

Issue 5.3 (30 March 2009)

Advertising