Data preparation, Configuration procedure – Nortel Networks 8000 User Manual

Page 352

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

8 Frame relay configuration

Nortel Secure Router 8000 Series

Configuration -WAN Access

Data preparation

To configure the backup of the FR over IP, you need the following data:

The IP addresses of Router A and Router D are 196.1.1.1/24 and 196.1.1.2/24

respectively.

The VC number

of the network segment between Router A and Router B are 100.

The VC number

of the network segment between Router B and Router C are 300.

The VC number

of the network segment between Router C and Router D are 200.

The IP address of the Ethernet interfaces on Router B and Router C are 10.1.1.1/24 and

10.1.1.2/24.

Configuration procedure

Step 1

Configure Router A.

# Encapsulate Serial 1/0/0 with FR.

<RouterA> system-view

[RouterA] interface Serial1/0/0

[RouterA-Serial1/0/0] link-protocol fr

[RouterA-Serial1/0/0] ip address 196.1.1.1 255.255.255.0

[RouterA-Serial1/0/0] quit

Step 2

Configure Router B.

# Encapsulate Serial 1/0/0 with FR and configure the interface type as DCE.

<RouterB> system-view

[RouterB] interface Serial1/0/0

[RouterB-Serial1/0/0] link-protocol fr

[RouterB-Serial1/0/0] fr interface-type dce

[RouterB-Serial1/0/0] fr dlci 100

[RouterB-fr-dlci-Serial1/0/0-100] quit

[RouterB-Serial1/0/0] quit

# Encapsulate Serial 2/0/0 with FR and configure the interface type as NNI.

[RouterB] interface Serial2/0/0

[RouterB-Serial2/0/0] link-protocol fr

[RouterB-Serial2/0/0] fr interface-type nni

[RouterB-Serial2/0/0] fr dlci 300

[RouterB-fr-dlci-Serial2/0/0-300] quit

[RouterB-Serial2/0/0] quit

# Configure GbE 3/0/0 and Tunnel 3/0/1.

[RouterB] interface ethernet3/0/0

[RouterB-Ethernet3/0/0] ip address 10.1.1.1 24

[RouterB-Ethernet3/0/0] quit

[RouterB] interface Tunnel 3/0/1

[RouterB-Tunnel3/0/1] source 10.1.1.1

[RouterB-Tunnel3/0/1] destination 10.1.1.2

[RouterB-Tunnel3/0/1] quit

# Create and configure the master and the slave PVCs.

[RouterB] fr switching

8-62

Nortel Networks Inc.

Issue 5.3 (30 March 2009)

Advertising