Pr 5230 instrument manual commissioning – Rice Lake PR5230 Fieldbus Transmitter User Manual
Page 165
Advertising
PR 5230 Instrument Manual
Commissioning
Sartorius
EN-165
5.13.2
Loading Configuration and Calibration Data into the Device
Caution!
All data which can be adjusted in the setup menu are overwritten!
If the file is loaded into several devices, changing the network settings and the host name
is indispensable!
Procedure:
1.
Open the CAL-switch in the device.
2.
Click on ‚Backup of Earom’ to open the
menu ‘Backup-/Restore’.
Following window appears:
3.
Click on ‚Durchsuchen’ (depending on Internet browser).
Advertising