2 display board, 3 weighing electronics board, Display board – Rice Lake PR5230 Fieldbus Transmitter User Manual
Page 40: Weighing electronics board, Installing the instrument and plug-in cards, Pr 5230 instrument manual
Installing the Instrument and Plug-in Cards
PR 5230 Instrument Manual
EN-40
Sartorius
4.2.2
Display Board
The display board is connected to the main board by a flat cables plug, see also Chapter 3.2.6.
4.2.3
Weighing Electronics Board
The weighing electronics board is connected to the main board by a plug.
Two weighing electronics board versions are available:
-
Standard (W1)
-
With intrinsically safe load cell supply for operation of load cells/platforms in Zones 1 and 21 (WE1),
see Chapter 3.2.6
The load cell junction board (see Chapter 4.4.3) is connected to the weighing electronics board via a ribbon
cable for direct connection of up to four load cells.
CAL switch
Connector load cell junction board
Note:
The weighing electronics board (W1) is also available as a spare, see Chapter Fehler!
Verweisquelle konnte nicht gefunden werden..