2 display board, 3 weighing electronics board, Display board – Rice Lake PR5230 Fieldbus Transmitter User Manual

Page 40: Weighing electronics board, Installing the instrument and plug-in cards, Pr 5230 instrument manual

Advertising
background image

Installing the Instrument and Plug-in Cards

PR 5230 Instrument Manual

EN-40

Sartorius

4.2.2

Display Board

The display board is connected to the main board by a flat cables plug, see also Chapter 3.2.6.

4.2.3

Weighing Electronics Board

The weighing electronics board is connected to the main board by a plug.
Two weighing electronics board versions are available:
-

Standard (W1)

-

With intrinsically safe load cell supply for operation of load cells/platforms in Zones 1 and 21 (WE1),

see Chapter 3.2.6

The load cell junction board (see Chapter 4.4.3) is connected to the weighing electronics board via a ribbon
cable for direct connection of up to four load cells.







CAL switch
















Connector load cell junction board


Note:

The weighing electronics board (W1) is also available as a spare, see Chapter Fehler!
Verweisquelle konnte nicht gefunden werden..

Advertising