4 installing the instrument and plug-in cards, 1 mechanical preparation, 2 hardware construction – Rice Lake PR5230 Fieldbus Transmitter User Manual

Page 38: Installing the instrument and plug-in cards, Mechanical preparation, Hardware construction, 4installing the instrument and plug-in cards

Advertising
background image

Installing the Instrument and Plug-in Cards

PR 5230 Instrument Manual

EN-38

Sartorius

4

Installing the Instrument and Plug-in Cards

Before starting work, please read Chapter 1 and follow all instructions!
Further procedures:
• Check the consignment: unpack the components specific to the application.
• Safety check: inspect all components for damage.
• Make sure the on-site installation is correct and complete including cables, e.g. power cable fuse

protection, load cells, junction box, data cable, console/cabinet, etc.

• If necessary, mount the plug-in cards (instrument must be disconnected from all voltage sources).
• Follow the instructions for installation of the unit relating to application, safety, ventilation, sealing and

environmental influences!

• Connect the cable from junction box or platform/load cell.
• If applicable: connect other data cables, power cable, etc.
• Connect the instrument power cable.
• Check the installation.

4.1

Mechanical Preparation

Have all required parts, technical documents and tools at hand for mounting. Secure the cable at the place of
installation; e.g., using cable ties. Remove the insulation from the cable ends, keep the strands short and fit
them with ferrules

4.2

Hardware Construction

The main electronics circuitry is accommodated on the following PCBs:
-

Main board

-

Display board

-

Weighing electronics board

Display board

Main board

Weighing electronics board

Advertising