4.7 Test Run Checklist
Review the checklist before performing a test run. Check each item that applies.
No.
Checklist
Page
1
Thoroughly read the manual before performing a test run.
–
2
Check the
.
3
Set the correct power supply voltage.
4
Turn on the power supply to the regenerative unit and drive.
5
Correctly sequence the Run commands.
6
The
should light after giving a Run command.
–
7
To give Run command from the digital operator, press
key to set to LOCAL.
8
To give Run command from the control circuit terminals, press the
to set REMOTE. (The LO/
RE indicator is lit off while REMOTE is set.)
RE
LO
RE
LO