4.7 Test Run Checklist

Review the checklist before performing a test run. Check each item that applies.

No.

Checklist

Page

1

Thoroughly read the manual before performing a test run.

2

Check the

Wiring Checklist on page 66

.

66

3

Set the correct power supply voltage.

76

4

Turn on the power supply to the regenerative unit and drive.

76

5

Correctly sequence the Run commands.

77

6

The

should light after giving a Run command.

7

To give Run command from the digital operator, press

key to set to LOCAL.

69

,

74

8

To give Run command from the control circuit terminals, press the

to set REMOTE. (The LO/

RE indicator is lit off while REMOTE is set.)

74

RE

LO

RE

LO