SV-GPS-250 Installation and Configuration

SkyView System Installation Guide – Revision S

8-3

Serial Connection

SkyView uses the SV-GPS-250 device set to POS 1 as its primary position source.

The SV-GPS-250 includes 18 feet of twisted wire for a serial connection to the SkyView display
via the display. This wire may be trimmed or lengthened as needed to suit the installation.

The color of the SV-GPS-250 wires matches the colors of the wires of the main display harness
that are intended for the GPS serial connection. The following table contains information
regarding the wires.

Function

Harness and SV-GPS-

250 Wire Color

SkyView Display

D37 Pin

SV-GPS-250 Tx /

Serial Port 5 Rx

Gray with

Violet stripe

11

SV-GPS-250 RX /

Serial Port 5 Tx

Gray with

Orange stripe

12

SV-GPS-250 Ground

Black

24

SV-GPS-250 Power

Orange

29

Table 45 – SV-GPS-250 Serial Connection Details

As mentioned before, if there are two or more displays in your SkyView system, all four of the
SV-GPS-250 module’s wires must be connected to all displays in parallel. This wiring scheme is
illustrated in Figure 56.

Figure 56 – SV-GPS-250 Connected to Multiple SkyView Displays