SV-GPS-250 Installation and Configuration

8-4

SkyView System Installation Guide - Revision S

If there is more than one SV-GPS-250 in your system, use the same scheme in Figure 56 on
different display serial ports for the other SV-GPS-250 modules, but connect power and ground
for the other SV-GPS-250 modules to the same power and ground connections (black and
orange wires) that are provided in the serial port 5 wiring bundle on the display harnesses. An
example of this configuration follows.

Figure 57 – Dual SV-GPS-250 Connected to Multiple Displays

Configuration

Go to the Serial Port Setup Menu (SETUP MENU > SYSTEM SETUP > SERIAL PORT SETUP>SERIAL
PORT 5 SETUP) and then configure serial port 5 as follows:

SERIAL IN DEVICE:

Dynon SV-GPS-250

SERIAL IN FUNCTION:

POS 1

SERIAL IN/OUT BAUD RATE:

38400

SERIAL OUT DEVICE:

NONE

If you have multiple SV-GPS-250 modules, connected as shown above, you must
configure the second serial port (serial port 4 if done as shown) as an SV-GPS-250
as well. Its SERIAL IN FUNCTION should be set to POS 2.