Figure 51 thumb screws on the wall shelf brackets – Nortel Networks 1000M User Manual

Page 120

Advertising
background image

120

Mounting the chassis

Allow for clearance on the left and right of the chassis for cables and
air flow. Refer to the equipment layout plan for measurements.

2

Draw a horizontal line on the plywood backboard.
This line indicates the vertical position of the bottom hole on the
horizontal wall shelf bracket. Refer to the equipment layout plan
for measurements.

3

Place the left shelf bracket against the plywood backboard. Place
the lower mounting hole over the intersection of the left vertical line
and the horizontal line.
Fasten the shelf bracket securely to the plywood backboard.
Use four #12 wood screws provided in the bracket kit (or other
appropriate fasteners) to fasten the shelf bracket to the backboard.

Note: Position the shelf bracket so that the two thumb screws,
located on the bottom of the bracket, face downward. Leave
the screws slightly loose, so you can adjust the brackets to the
width of the chassis if necessary.

4

Place the right shelf bracket against the plywood backboard. Place
the lower mounting hole over the intersection of the right vertical
line and the horizontal line. Fasten the shelf bracket securely to
the plywood backboard with the remaining four #12 wood screws
provided in the bracket kit (or other appropriate fasteners). See

Figure 51 "Thumb screws on the wall shelf brackets" (page 120)

.

Note: Make sure the shelf bracket is oriented with the two
thumb screws, located on the bottom face of the bracket, facing
downwards. Leave the screws slightly loose, so you can adjust
the brackets to the width of the chassis if necessary.

Figure 51
Thumb screws on the wall shelf brackets

Nortel Communication Server 1000

Communication Server 1000M and Meridian 1 Small System Installation and Commissioning

NN43011-310

01.04

Standard

Release 5.0

13 May 2008

Copyright © 2008, Nortel Networks

.

Advertising