Nortel Networks 1000M User Manual

Page 127

Advertising
background image

127

Installing the system ground

Contents

This section contains information on the following topics:

"Introduction" (page 127)

"Cabinets or chassis powered by the same service panel" (page 128)

"Cabinets or chassis powered by different service panels" (page 128)

"Grounding instructions for cabinets and chassis" (page 129)

"Multiple pieces of equipment in an equipment rack/cabinet" (page 134)

Introduction

This chapter describes how to install and connect the ground source to the
Small System cabinets and chassis. This chapter contains the following
procedures:

Procedure 12 "Grounding the cabinets or chassis" (page 129)

Procedure 13 "Earthing the cabinets or chassis (UK)" (page 134)

This chapter also describes how to ground multiple pieces of Chassis
system equipment in an equipment rack/cabinet when one or more pieces
of equipment does not have a grounding lug. See

"Multiple pieces of

equipment in an equipment rack/cabinet" (page 134)

.

Make sure you read the grounding requirements in the chapters on system
and site requirements in Communication Server 1000M and Meridian 1
Small System Planning and Engineering (NN43011-220)
before proceeding
further.

Nortel Communication Server 1000

Communication Server 1000M and Meridian 1 Small System Installation and Commissioning

NN43011-310

01.04

Standard

Release 5.0

13 May 2008

Copyright © 2008, Nortel Networks

.

Advertising