Figure 63 power cord routing – Nortel Networks 1000M User Manual

Page 144

Advertising
background image

144

Installing the power supplies for the Cabinet system

Figure 63
Power cord routing

7

Mount the NTAK28 Breaker Assembly to the wall within 0.9 m (3
ft) of the cabinet it is serving. See

Figure 64 "NTAK28 Breaker

Assembly location" (page 145)

.

Secure the breaker assembly with four #10 13 mm (1/2 in.) minimum
wood screws.

Note: One NTAK28 Breaker Assembly is required for each
cabinet.

Nortel Communication Server 1000

Communication Server 1000M and Meridian 1 Small System Installation and Commissioning

NN43011-310

01.04

Standard

Release 5.0

13 May 2008

Copyright © 2008, Nortel Networks

.

Advertising