Running a method (steps 6 to 9), Running a method, Steps 6 to 9) 163 – Hach-Lange TITRALAB 840_845 Reference Manual User Manual

Page 163: Titra lab

Advertising
background image

Titra

Lab

®

TitraLab 840 and 845 Reference Manual

Page 163

Running a
method
(steps 6 to 9)

Before starting,

see "Running a method (preliminary steps)", page 162

.

6.

User ID and sample temperature.

7.

Sample ID and Test portion quantity.

8.

Rinse electrodes then dip electrodes in test 1 and confirm.

9.

Measurements start after a Start timer delay (if programmed).

If

Sample Run Start = Shortcut

is selected in

the Setup > Configuration menu, screens of steps 7 to 9 are
not proposed. So, it is important to dip the electrodes into
the sample before running the method at step 6 !

Refer to "Sample Run Start/Run End (Standard/Shortcut)",
page 173

.

Refer to "Running a method (steps 10 to 12)", page 164

.

Entry of the User ID (if User ID
= Yes has been selected),

see "User ID (Yes/No)", page 194

.

Entry of the sample temperature (if
Temperature = Entered
has been selected),

see "Temperature Probe/ Fixed at

25°C/Entered", page 189

.

Entry of the Sample ID and Test
portion quantity (titration methods
only).

Refer to "Start timer", page 184

.

Refer to "Run window", page 161

.

Advertising