13 starting/stopping e-mail transmissions, Starting/stopping e-mail transmissions -48 – Yokogawa Data Acquisition with PID Control CX2000 User Manual

Page 78

Advertising
background image

2-48

IM 04L31A01-17E

2.13 Starting/Stopping E-mail Transmissions

Explanation

Starting/Stopping E-mail Transmissions

• If the e-mail transmission is started, the e-mail transmission function is activated.
• If the e-mail transmission is stopped, e-mail transmission is disabled. Unsent e-

mail messages are cleared.

Note

• If the CX enters the basic setting mode while the e-mail transmission is started, the e-mail

transmission is stopped. If the CX returns to the operation mode from the basic setting mode,
the condition that existed before entering the basic setting mode is resumed.

• If e-mail transmission fails, the message is retransmitted up to twice at 30-s intervals. If

retransmission fails, the e-mail message is discarded.

Contents of the E-mail Message

The figure below shows examples of an e-mail messages.

From: [email protected]
Date: Sun, 24 Dec 2000 13:08:23 +0900 (JST)
Subject: (CX) Alarm_summary
To: [email protected], [email protected]

LOOP1
TEMPERATURE

Alarm summary.
<Host name>
CX

<CH>03
<Type>1R
<On>Dec.24 13:05:16
<Off>Dec.24 13:08:17

<Inst. value>
Dec.24 13:08:17
01=-0.312V
02=-0.267V
03=-0.245V

.

.

29=-0.645V
30=-0.649V

Access the following URL in order to look at
http://CX.good.com/

Alarm e-mail

Subject

Header1

Alarm no./type

Channel no.

Alarm occurrence/
release date/time

Instantaneous
values (when
included)
• Date/Time
• Channel number
• Inst. value

Sender URL
(when inluded)

Header2

From: [email protected]
Date: Sat, 23 Dec 2000 01:00:09 +0900 (JST)
Subject: (CX) Periodic_data
To: [email protected]

LOOP1
Scheduled

Periodic data.
<Host name>
CX

<Time>
Dec.23 01:00:01

Scheduled e-mail

Subject

Header1
Header2

From: [email protected]
Date: Sat, 23 Dec 2000 07:31:58 +0900 (JST)
Subject: (CX) System_warning
To: [email protected], [email protected]

LOOP1
RAW MATERIAL

Power failure.
<Host name>
CX

<Power fail>Dec.23 07:30:12
<Power on>Dec.23 07:31:32

System e-mail (power recoery)

Subject

Header1

Cause of e-mail
transmission

Details

Header2

From: [email protected]
Date: Sat, 23 Dec 2000 23:00:09 +0900 (JST)
Subject: (CX) Report_data
To:[email protected], [email protected]

LOOP1 DAILY
RAW MATERIAL

Hourly report.
<Host name>
CX

Dec.23 23:00:00
<CH>01
<Ave>-0.226
<Max>0.698
<Min>-0.972
<Sum>-1.537000E+01
<Unit>V

<CH>02
<Ave>-0.225
<Max>0.700
<Min>-0.971

.

Report e-mail

Subject

Header1

Date/time
Channel no.
Report data
• Average
• Maximum
• Minimum
• Sum
• Unit

Header2

Advertising