Yokogawa Data Acquisition with PID Control CX2000 User Manual

Page 56

Advertising
background image

1-44

IM 04L31A01-01E

• Example in which the 2

nd

segment of the 1

st

loop is a soak segment

When set to ramp-prioritized PV1 start, the ramp-rate of the 1

st

loop is prioritized. The

program operation start point of the 1

st

loop will be point C1, D1, or E1 (depends on

the PV position a to e at that point). The program operation start point of the 2

nd

loop

(one of the other loops) is at the same time as that of the 1

st

loop. For example, if the

program operation start point of the 1

st

loop is point C1, the program operation start

point of the 2

nd

loop is point C2.

PV

SEG1

A1

B1

D1

E1

B2

C1

A2

C2

E2

D2

SEG2

SEG3 SEG4

SEG5

Time

a

b

c

d

e

Program pattern for
the 2nd loop

Program pattern for
the 1st loop

• Example in which the 3

rd

segment of the 2

nd

loop is a soak segment

When set to ramp-prioritized PV2 start, the ramp-rate of the 2

nd

loop is prioritized.

The program operation start point of the 2

nd

loop will be one of the points from A2 to

E2 (depends on the PV position a to e at that point). The program operation start
point of the 1

st

loop (one of the other loops) is at the same time as that of the 2

nd

loop.

For example, if the program operation start point of the 2

nd

loop is point A2, the

program operation start point of the 1

st

loop is point A1.

PV

SEG1

A1

B1

D1

E2

B2

C1

A2

C2

E1

D2

SEG2

SEG3

SEG4

Time

Program pattern for
the 1st loop

Program pattern for
the 2nd loop

a

b

c

d

e

1.11 Program Control Related Settings