1 connecting the hardware, Ladder program development flow – Yaskawa MP900 Series Ladder Programming Manual User Manual

Page 30

Advertising
background image

3.1 Ladder Program Design Procedures

3.1.1 Connecting the Hardware

3-3

Ladder Program Development Flow

3

3.1.1 Connecting the Hardware

The flow of ladder program development that is described in this chapter is based on the following system configura-
tion.

∗ In this chapter, M registers in the Machine Controller are used to simulate virtual I/O devices in the example system.

In practice, the input and output signals would be connected to I/O Modules on the Machine Controller, and the ladder program
would be created using I and O registers.

Virtual I/O Devices*
(Entered on MPE720.)

SW1

SW2

SW3

MB00000 MB00001

Lamp 1

Lamp 2

MB00010

MB00011

Ethernet cable

PC running MPE720

24-VDC

power supply

Machine Controller

MB00002

DC24V

DC 0V

MP2300

YASKAWA

TEST

RDY

ALM

TX

RUN

ERR
BAT

MON

CNFG

INT

SUP

STOP

SW1

OFF ON

BATTERY

CPU I/O

M-I/II

218IF-01

ERR

COL

RX

RUN

STRX

TX

INIT
TEST

ON

OFF

PORT

10Base-T

Optional Module

Optional Module

Advertising
This manual is related to the following products: