2 controlling the execution of drawings, 1 ) controlling the execution of drawings – Yaskawa MP900 Series Ladder Programming Manual User Manual

Page 46

Advertising
background image

4.2 Ladder Drawings

4.2.2 Controlling the Execution of Drawings

4-5

Programming

4

4.2.2 Controlling the Execution of Drawings

( 1 ) Controlling the Execution of Drawings

Drawings are executed based on their priorities, as shown in the following figure.

Œ

The parent drawing of each drawing is automatically called and executed by the system.

( 2 ) Scheduling the Execution of Scan Process Drawings

All scan process drawings are not executed at the same time. The following figure shows how execution time is allo-
cated to them based on their priority levels.

∗ This time is used to execute internal system processing, such as self-diagnosis.

The low-speed scan is executed during the time that is not used by the high-speed scans. Set the time of the high-speed
scan to approximately twice the total execution time of the high-speed drawings (DWG.H).

Power ON

DWG.A
Startup drawing

DWG.H
High-speed scan
process drawings

DWG.L
Low-speed scan
process drawings

Every high-speed scan

Batch outputs

Batch outputs

Batch inputs

Batch inputs

Every low-speed scan

Operation error

Interrupt signal

DWG.X00

Operation error drawing

X: A, H, or L

Execution is continued from

the point before the error.

DWG.I
Interrupt process drawing

Execution is continued
from the point before
the interrupt.

Background*

DWG.L

DWG.H

High-speed scan High-speed scan

Low-speed scan

High-speed scan High-speed scan

: Execution in progress

Advertising
This manual is related to the following products: