Chapter 6 Maintenance and Inspection

6 - 2

6.2 Daily and Periodic Inspections

Inspection cycle

Periodic

Part to

inspect

Inspection item

Detail of inspection

Daily

Annual Biennial

Inspection method

Criterion

Test equipment

Environment

Check the ambient temperature,
humidity, and dust.

{

See Section 2.1, "Installation."

The ambient temperature must
be within -10

°C to +50°C without

congelation. The ambient
humidity must be 90% RH or less
without condensation.

Thermometer,
hygrometer,
recorder

Whole inverter

Check for abnormal vibrations and
noise.

{

Check visually and by listening.

There must be no abnormality
found.

General

Power supply
voltage

Check that the main circuit voltage
is normal.

{

Measure the voltage between the
main circuit terminals R, S, and T.

The measured voltage must be
within the allowable tolerance for
AC power voltage.

Tester, digital
multimeter

(1) Check the ground resistance

between the main circuit and
ground terminals with a megger.

{

Disconnect all input and output cables
from the inverter's main circuit terminal
block, detach the control circuit terminal
block from the inverter, and remove the
jumper for switching the inverter's
internal filter function. Subsequently,
measure the insulation resistance
between the ground terminal and the
jumper connecting all the following
terminals:
R, S, T, U, V, W, P, PD, N, RB, R0, and
T0

The measured ground resistance
must be 5M

Ω or more.

500 VDC class
megger

(2) Check screws and bolts for

loosening.

{

Retighten loose screws and bolts.

There must be no abnormality
found.

General check

(3) Check each part for any trace of

overheating.

{

Check visually.

There must be no abnormality
found.

(1) Check the conductors for

distortion.

{

Connecting
conductors and
cables

(2) Check the cable insulations for

damage.

{

Check visually

There must be no abnormality
found.

Terminal block

Check the terminal blocks for
damage.

{

Check visually

There must be no abnormality
found.

Inverter circuit
and converter
circuit (including
resistors)

Check the resistance between
terminals.

{

Remove all cables from the
inverter's main circuit terminal block.
Use a tester (in 1

Ω range mode) to

measure the following:
- Resistance between terminals R,
S, and T and terminals P and N
- Resistance between terminals U,
V, and W and terminals P and N

See Section 6.5, "Method of
Checking the Inverter and
Converter Circuits." Standard
operating life of inverter circuit
until replacement: 106 cycles of
starting and stopping (*3)

Analog tester

(1) Check for liquid leak.

{

Smoothing
capacitor

(2) Check that the relief valve does

not protrude or swell.

{

Check visually.

There must be no abnormality
found.
Target operating life until
replacement: 10 years
(*1) (*3)

Capacitance
meter

(1) Check that no fluttering sound is

generated during the relay
operation.

{

Check by listening.

There must be no abnormality
found.

Main
circuit

Relay

(2) Check the contacts for damage.

{

Check visually.

There must be no abnormality
found.

(1) While performing a unit

operation of the inverter, check
the balance output voltage
among the individual phases.

{

Measure the voltage between the
cables connected to the main circuit
terminals U, V, and W.

The inter-phase voltage balance
must be as follows:
200 V class models: 4 V or less
400 V class models: 8 V or less

Control

and

protective

circuits

Operation

(2) Carry out a sequential

protection operation test, and
check the protective and display
circuits for any abnormality.

{

Short-circuit or open the protective
circuit

outputs

as

a

simulation.

An error must be detected
according to the sequence.

Digital
multimeter,
rectifier
instrument, and
voltmeter

(1) Check for abnormal vibrations

and noise

{

Turn the fan manually during the
inverter power-off status.

Cooling fan

(2) Check the joints for loosening.

{

Check visually.

The fan must rotate smoothly.
There must be no abnormality
found.
Standard operating life until
replacement: 10 years
(*2) (*3)

Cooling
system

Heat sink

Check for clogging.

{

Check

visually.

The heat sink must not be
clogged.

(1) Check that all LEDs light up

normally.

{

Check visually.

The LEDs must light up normally.

Monitor

(2) Clean the monitor.

{

Clean the monitor with a rag.

Display

Meter

Check that meter readings are
normal.

{

Check the meter readings on the
panel.

The readings must meet the
standard and control values.

Voltmeter and
ammeter

(1) Check for abnormal vibrations

and noise.

{

Check vibrations and noise visually,
by listening, and with physical
senses.

There must be no abnormality
found.

General

(2) Check for unusual smells.

{

Check for any unusual smells
caused by overheating or damage.

There must be no abnormality
found.

Motor

Insulation
resistance

Check the ground resistance
between all motor terminals and the
ground terminal with a megger.

{

Remove the cables from the
inverter's main circuit terminals U, V,
and W, connect the motor wires (for
three phases) with one another, and
measure the ground resistance
between the motor wires and the
ground terminal.

The measured ground resistance
must be 5M

Ω or more.

500 VDC class
megger

*1 The operating life of the smoothing capacitor is under the influence of the ambient temperature. Refer to Section 6.6, "Smoothing-Capacitor Life Curve," as a standard for the

operating life until replacement.

*2 The operating life of the cooling fan varies depending on environmental conditions, including the ambient temperature and dust. Check the status of the cooling-fan operation

during daily inspections.

*3 The standard operating life (number of years or operation cycles) and the data described in Section 6.6, "Smoothing-Capacitor Life Curve," are based on the expected design

life, but they do not indicate the guaranteed life of any parts.