Lenze ETC Motion Control User Manual

Page 14

Advertising
background image

Getting started

System overview
Examples for an automation system

2

2.1
2.1.1

l

14

EDSTCXN EN 2.0

To carry out its allocated control function the ETC control needs various
programs which are transferred from the IPC (or standard PC):

ƒ Operating system or firmware of the control (e.g. ETCHC.rsc)

ƒ PLC programs (e.g. SPSDummy.prg)

ƒ CNC programs; i.e. cycle and DIN programs (e.g. 9000.zyk or

Nikolaus.din)

The ETC control is operated and maintained via the IPC (or standard PC). The
following applications might run on it:

ƒ Windows 2000 or XPoperating system

ƒ Terminal program (e.g. HyperTerminal) for establishing the Ethernet

connection between IPC and ETCHx control and for the configuration of
the ETCHx control via the monitor interface (e.g. firmware update). This
is not required for the ETCPx.

ƒ ETC−MMI gateway as communications program between Windows

applications and the ETC control.

ƒ Lenze ETC−MMI for the configuration, operation and monitoring of the

ETC control and for creating CNC programs.

ƒ CoDeSys development environment for the creation and testing of PLC

programs.

)

Note!

An external keyboard is required at the IPC for commissioning. It
is not required for normal operation.

IPC

Advertising