Backing up a processlogix server to tape – Rockwell Automation 1757-SWKIT3200 ProcessLogix R320.0 Installation and Upgrade Guide User Manual

Page 26

Advertising
background image

Publication 1757-IN032B-EN-P - April 2001

1-6 System Software Upgrade Procedures

What should you do if you do not meet the recommended
memory requirements:

If you do not meet the minimum free disk space requirement, you
can try one or more of the following actions to increase your free
disk space:

Compact the ERDB (Use the DbAdmin utility:
Start

Programs

ProcessLogix Engineering Tools

DBADMIN

Tools

Compact Database.)

Remove old error logs in directory C:\ErrorHandling,

Remove old backups you have of the ERDB.

Remove the Service Pack Uninstall directory C:\WINNT\
$NtServicePackUninstall$.

Move any of your application files not residing in the
C:\Honeywell tree to the other partition, if you have another
partition.

Backing Up a ProcessLogix Server to Tape

Use the following procedure to back up your current ProcessLogix
Server data to tape.

1. If the Server to be backed up is a member of a redundant Server

pair, synchronize the ER and Server databases.

a. Refer to Synchronizing ERDB on Redundant Servers on

page 1-63.

b. Refer to Synchronizing Server Databases on Redundant

Servers on page 1-71.

2. Insert a tape into the PC’s tape drive.

Wait for the tape to mount (stop making noise).

3. Click Start

Run.

ATTENTION

!

Before continuing, you MUST exit all ProcessLogix
applications and stop all ProcessLogix services.

Refer to Stopping ProcessLogix Applications and
Services on page 1-8.

Advertising