Step 33 – Rockwell Automation 1757-SWKIT3200 ProcessLogix R320.0 Installation and Upgrade Guide User Manual
Page 91

Publication 1757-IN032B-EN-P - April 2001
System Software Upgrade Procedures 1-71
Synchronizing Server Databases on Redundant Servers
31. Click Start
⇒
Programs
⇒
ProcessLogix Server
⇒
Station.
32. Click View
⇒
System Status
⇒
Server Redundancy to call up the
Server redundancy display.
33. Click the Oper field in the lower right corner of the display.
34. Key in >mngr< in the open Enter password field above the
display and press <Enter>.
35. Click Synchronize. When the Synchronize Databases (Y/N)
prompt appears, key in >Y< in the entry field above the display
and press <Enter>.
36. Wait for the synchronization to complete (“Synchronization
Complete” prompt appears) and verify that the display shows
simulated Green LED indications for the following states:
Primary Server
•
Running
Backup Server
•
Synchronized
•
Running
Link Status
•
Link 0 (LNK00) - In use for control & data information
37. Click Station
⇒
Exit.
38. Click OK to exit Station.