1-2 module replacement precautions, Module replacement precautions, Tools required for inspections – Omron HOME SECURITY SYSTEM - MOTION SENSOR FQM1-MMA21 User Manual

Page 284

Advertising
background image

261

Inspections

Section 10-1

Note

The following table shows the allowable voltage fluctuation ranges for source
power supplies.

Tools Required for Inspections

Required Tools

• Phillips-head screwdriver

• Voltage tester or digital multimeter

• Industrial alcohol and clean cotton cloth

Tools Required
Occasionally

• Synchroscope

• Oscilloscope with pen plotter

• Thermometer and hygrometer (humidity meter)

10-1-2 Module Replacement Precautions

Check the following after replacing any faulty Module.

• Do not replace a Module until the power is turned OFF.

• Check the new Module to make sure that there are no errors.

• If a faulty Module is being returned for repair, describe the problem in as

much detail as possible, enclose this description with the Module, and
return the Module to your OMRON representative.

• For poor contact, take a clean cotton cloth, soak the cloth in industrial

alcohol, and carefully wipe the contacts clean. Be sure to remove any lint
prior to remounting the Module.

Note

(1) When replacing a Coordinator Module or Motion Control Module, be sure

that not only the user program but also all other data required for opera-
tion is transferred to or set in the new Coordinator Module before starting
operation, including DM Area and System Setup settings. If data area and
other data are not correct for the user program, unexpected operation or
accidents may occur.

(2) The System Setup is stored in the parameter area within the Coordinator

Module or Motion Control Module. Be sure to transfer these settings to
the new Coordinator Module or Motion Control Module when replacing a
Module.

(3) After replacing a Motion Control Module, always set the required settings.

(4) In some cases, parameter data used in the Motion Control Modules is ac-

tually stored in the Coordinator Module’s DM Area, so be sure to transfer
the DM Area settings when replacing a Coordinator Module.

4

Installation and
wiring

Check that each Module is
connected and locked to the
next Module securely.

No looseness

Press the connectors together
completely and lock them with the
sliding latches.

Check that cable connectors
are fully inserted and locked.

No looseness

Correct any improperly installed
connectors.

Check for loose screws in
external wiring.

No looseness

Tighten loose screws with a Phil-
lips-head screwdriver.

Check crimp connectors in
external wiring.

Adequate spacing between
connectors

Check visually and adjust if neces-
sary.

Check for damaged external
wiring cables.

No damage

Check visually and replace cables if
necessary.

Supply voltage

Allowable voltage range

100 to 240 V AC

85 to 264 V AC

No.

Item

Inspection

Criteria

Action

Advertising