Testing operation – Omron HOME SECURITY SYSTEM - MOTION SENSOR FQM1-MMA21 User Manual

Page 40

Advertising
background image

17

Basic Operating Procedure

Section 1-6

7. Transferring the
Programs

When the programs has been created in the CX-Programmer, they must be
transferred to the Motion Control Modules through the Coordinator Module.

8. Testing Operation

8-a) I/O Wiring Checks

Check Output Wiring

With the FQM1 in PROGRAM mode, force-set and force-reset output bits
from the CX-Programmer and verify that the corresponding outputs operate
properly.

Check Input Wiring

Activate input devices, such as sensors and switches, and verify that the cor-
responding input indicators light. Also, use the Bit/Word Monitor operation
from the CX-Programmer to verify the operation of the corresponding input
bits.

8-b) Trial Operation

Use the CX-Programmer to switch each Module to MONITOR mode.

Using the CX-Programmer

8-c) Monitoring and
Debugging

There are several ways to monitor and debug FQM1 operation, including the
force-set and force-reset operations, differentiation monitoring, time chart
monitoring, data tracing, and online editing.

Force-Set and Force-Reset

When necessary, the force-set and force-reset operations can be used to
force the status of bits and check program execution.

From the CX-Programmer, select the bit to be force-set or force-reset and
then select Force On or Off from the PLC menu.

Differentiation Monitor

The differentiation monitor operation can be used to monitor the up or down
differentiation of particular bits. Use the following procedure from the CX-Pro-
grammer.

CX-Programmer

Trial Operation

Select PC - Mode - MONITOR.

Actual operation

Select PC - Mode - RUN.

FQM1

Coordinator Module

Peripheral
port

Advertising