Environmental specifications, Installation and configuration – Nortel Networks Circuit Card User Manual

Page 204

Advertising
background image

Page 204 of 906

NT5D11 and NT5D14 Lineside T1 Interface cards

553-3001-211 Standard 3.00 August 2005

Environmental specifications

Table 79 lists the environmental specifications of the lineside T1 card.

Installation and configuration

Installation and configuration of the lineside T1 card consists of six basic
steps:

1

Configure the dip switches on the lineside T1 card for the environment.

2

Install the lineside T1 card into the selected card slots in the IPE shelf.

3

Cable from the I/O panel to the Customer Premise Equipment (CPE) or
CSU, MMI terminal or modem (optional), external alarm (optional), and
other lineside T1 cards for daisy chaining use of MMI terminal
(optional).

4

Configure the MMI terminal.

5

Configure the lineside T1 card through the system software and verify
self-test results.

6

Verify initial T1 operation and configure MMI (optional).

Steps 1-5 are explained in this section. Step 6 is covered in “Man-Machine T1
maintenance interface software” on

page 225

.

Table 79
Lineside T1 card – environmental specifications

Parameter

Specifications

Operating temperature-normal

15° to +30° C (+59° to 86°F), ambient

Operating temperature-short term

10° to +45° C (+50° to 113°F), ambient

Operating humidity-normal

20% to 55% RH (non-condensing)

Operating humidity-short term

20% to 80% RH (non-condensing)

Storage temperature

–50° to +70° C (–58° to 158°F), ambient

Storage humidity

5% to 95% RH (non-condensing)

Advertising