INFICON 3000 Micro GC Gas Analyzer Operating Manual User Manual

Page 226

Advertising
background image

8 - 44

PN

07

4-

51

9-

P1

C

3000 Micro GC Operating Manual

Proceed as follows:

1

Connect the Carrier Gas Cylinder Recharge Kit (PN PNU-2058) to the supply
tank via the CGA-580 fitting. See

Figure 8-44

. To avoid leaks, tighten the

connections securely.

2

Make sure the needle valve of the Carrier Gas Cylinder Recharge Kit is fully
closed by turning the needle valve clockwise until it is firmly seated. See

Figure

8-44

.

Figure 8-44 Cylinder recharging kit setup

3

Partially open the valve on the supply tank. No gas should flow.

4

Loosely connect the 1/8 in. tube from the Carrier Gas Cylinder Recharge Kit to
the CARRIER FILL (Swagelok) port on the Portable 3000 Micro GC back
panel. See

Figure 8-45

.

Figure 8-45 Back of Portable 3000 Micro GC

5

Partially open the needle valve on the Carrier Gas Cylinder Recharge Kit and
listen for gas leaking through the loose 1/8 in. fitting on the back panel. This
purges the Carrier Gas Cylinder Recharge Kit transfer lines so that no air enters
Portable 3000 Micro GC.

6

After the transfer lines have been sufficiently purged (about fifteen seconds),
tighten the 1/8 in. fitting on the back panel of Portable 3000 Micro GC.

To the 3000 Micro GC
1800 PSI (12,450 kPa)

Carrier fill port

Transfer line

with Swagelok

fittings

Supply tank

Overpressure vent

Supply tank
valve

Pressure gauge

CGA 580 fitting

Needle valve

Carrier fill
port

Carrier
jumper tube

Carrier in ports

Advertising