5 mounting the heated sample conditioners – INFICON 3000 Micro GC Gas Analyzer Operating Manual User Manual

Page 98

Advertising
background image

5 - 24

PN

07

4-

51

9-

P1

C

3000 Micro GC Operating Manual

5.1.6.3.5 Mounting the Heated Sample Conditioners

1

Add female nut, front ferrules and back ferrules to the transfer line as shown in

Figure 5-29

.

Figure 5-29 Installing female nut, back, and front ferrules onto transfer line

Figure 5-30 Accessory with copper coil and nut installed

2

Hold the heated sample introduction accessory at an angle to the instrument
and slide the right side screw slots under the loosened 3000 Micro GC cover
screws. See

Figure 5-31

and

Figure 5-32

.

Figure 5-31 Installing the mounting plate onto the 3000 Micro GC

(2-Channel 3000 Micro GC shown, top view)

Female nut

Accessory

sample outlet

Transfer line

Copper coil

1/16 in. back ferrule

3000 Micro GC
sample inlet

1/16 in. front ferrule

Copper coil and

nut installed

3000 Micro GC

Loosen

screws

Advertising