5 mounting the heated sample conditioners – INFICON 3000 Micro GC Gas Analyzer Operating Manual User Manual
Page 98
5 - 24
PN
07
4-
51
9-
P1
C
3000 Micro GC Operating Manual
5.1.6.3.5 Mounting the Heated Sample Conditioners
1
Add female nut, front ferrules and back ferrules to the transfer line as shown in
.
Figure 5-29 Installing female nut, back, and front ferrules onto transfer line
Figure 5-30 Accessory with copper coil and nut installed
2
Hold the heated sample introduction accessory at an angle to the instrument
and slide the right side screw slots under the loosened 3000 Micro GC cover
screws. See
Figure 5-31 Installing the mounting plate onto the 3000 Micro GC
(2-Channel 3000 Micro GC shown, top view)
Female nut
Accessory
sample outlet
Transfer line
Copper coil
1/16 in. back ferrule
3000 Micro GC
sample inlet
1/16 in. front ferrule
Copper coil and
nut installed
3000 Micro GC
Loosen
screws