4.1 Site Preparation

Before installation, make sure that the installation site is fully prepared. Contact

INFICON

with any question regarding site preparation.

4.1.1 List of Required Tools

Adjustable wrench (small)

Adjustable wrench (large)

Two 7/16 in. open-ended wrenches

9/16 in. open-ended wrench

5/16 in. open-ended wrench

1/4 in. open-ended wrench

Tubing cutter

Teflon

®

tape

4.1.2 Tubing and Fitting Requirements

Use pre-cleaned copper or stainless steel tubing, 1/8 in. OD, for carrier gas
connections between the tank regulator and 3000 Micro GC.

3000 Micro GC has a 1/8 in. Swagelok male carrier gas connection.

Pre-cleaned, GC grade copper tubing in 50 ft. lengths can be purchased
from various chromatography vendors. It is also included in the optional
Install Kit for Micro GC (PN G2860A).

Do not clean the tubing with a solvent prior to use.

Do not use Teflon or Tygon

®

tubing for the carrier gas.

Swagelok 1/8 in. nuts, front ferrules, and back ferrules.