Figure 5-32 – INFICON 3000 Micro GC Gas Analyzer Operating Manual User Manual

Page 99

Advertising
background image

5 - 25

PN

07

4-

51

9-

P1

C

3000 Micro GC Operating Manual

Figure 5-32 Installing the heated sample instroduction accessory on 3000 Micro GC

3

Tighten the 3000 Micro GC cover screws.

4

Insert the transfer line into the 3000 Micro GC sample inlet fitting as far as
possible, then back it out about 1 mm.

5

Finger tighten the female nut, then tighten an additional 1/8 turn with the
5/16 in. open-ended wrench.

6

If the transfer line is kinked, remove the sample introduction accessory and trim
about 1 mm off the end of the transfer line. Make the cut square and
perpendicular. Reassemble. See

Figure 5-33

.

Figure 5-33 Trimming the transfer line

7

Install and tighten the upper left cover mounting screw using T20 Torx
screwdriver.

8

Tighten the remaining cover screws with a T20 Torx screwdriver.

9

Wrap one of the two pieces of insulation around the transfer line. Retain the
remaining transfer line, insulation and extra mounting hardware as spares.

Sample inlet fitting

Transfer line

Trim 1 mm of

transfer line

Transfer line

Advertising