Procedure for setting up communication – Yaskawa iQpump Programming Manual User Manual

Page 82

Advertising
background image

82

YASKAWA

TM.iQp.02 iQpump Drive Programming Manual

Figure 1.77

Figure 77 Communication Connection Terminals and Terminating Resistance

Important:

• Separate the communication cables from the main circuit cables and control circuit wiring.

• Use shielded cables for the communication cable, and use proper shield clamps.

• When using RS-485 2 Wire communication, connect S+ to R+, and S- to R-, on the control circuit terminal board. See

Figure 78

.

• Terminate shield at one end only.

Figure 1.78

Figure 78

Procedure for Setting Up Communication

Use the following procedure to perform communication with the PLC.

1. Turn OFF the input power to the iQpump drive and connect the communication cable between the PLC and the Drive.
2. Turn ON the input power to the Drive.
3. Set the required communication parameters (H5-01 to H5-09) using the Digital Operator.
4. Turn OFF the input power to the Drive, and check that the Digital Operator display has completely faded.
5. Turn ON the input power to the iQpump drive once again.
6. Perform communication with the PLC.

Terminating resistance (1/2W, 110 Ohms)

RS-422A
or RS-485

Switch

S1

O
F
F

1

Terminating
resistance on

DIP Switch S1 located on
terminal board.

2

1

Advertising