3. Installation

3−26

Festo P.BE−SPC200−EN en 0901d

3.5

Installing the SPC200

Warning
Before carrying out installation and/or maintenance work,
switch off the following in the sequence specified:

1. the compressed air supply

2. the load voltage for field devices and proportional

directional control valves (plug X2, pin 1)
Ĉ the load voltage supply for the outputs

(plug X6/X8, pin 8)

Ĉ if applicable, the load voltage supply on the axis

interface string

Ĉ operating voltage supply for internal electronics

of the SPC200 and field devices (plug X2, pin 2).

You can thereby avoid:

ć

uncontrolled movements of the connected actuators

ć

uncontrolled movement of loose tubing

ć

undefined switching states.

Please note
Identify the cable connected to the SPC200. You can then
avoid confusion of similar plugs during conversion work.