Festo Кабели и принадлежности User Manual

Page 451

Advertising
background image

C. Technical appendix

C−5

Festo P.BE−SPC200−EN en 0901d

Wait

ţ 10 s

Initialization phase

Switch on the operating
voltage and load voltage at
the same time

Set ENABLE

Switch on the load voltage

Wait

ţ 1 s

Create readiness to operate

Wait

ţ 10 s

Reset:
ćăENABLE
ćăSTOP
ćăRESET or START/RESET

Switch on the operating
voltage

1

Switch on

operating and load

voltage supplies

at the same

time?

Yes

No

1

2

2

2

1

Operating and load voltage supplies of the SPC200

2

Each voltage must be stable 24 V DC −5/+25 %

Fig. C/1:

Create readiness to operate

Advertising