Auto. restart after power failure, Ice build control – Carrier 17/19EX User Manual

Page 104

Advertising
background image

Auto. Restart After Power Failure

When an autorestart condition occurs, each chiller may have a delay added to the start-up

sequence, depending on its lead/lag configuration. The lead chiller does not have a delay. The

lag chiller has a 45-second delay. The standby chiller has a 90-second delay. The delay time is

added after the chiller water flow verification. The PIC controls ensure that the guide vanes are

closed. After the guide vane position is confirmed, the delay for lag and standby chiller occurs

prior to energizing the oil pump. The normal start-up sequence then continues. The auto. restart

delay sequence occurs whether the chiller is in CCN or LOCAL mode and is intended to stagger

the compressor motors from being energized simultaneously. This will help reduce the inrush

demands on the building power system.

Ice Build Control

Ice build control automatically sets the chilled WATER/BRINE CONTROL POINT of the

machine from normal operation set point temperature to a temperature where an ice building

operation for thermal storage can be accomplished.

Note: For ice build control to properly operate, the PIC controls must be placed in CCN mode.

See

Figure 16

and

Figure 17

.

The PIC can be configured for ice build operation. Configuration of ice build control is

accomplished through entries in the Config table, Ice Build Setpoint table, and the Ice Build

Time Schedule table.

Figure 16

and

Figure 17

show how to access each entry.

Advertising