Modify equipment configuration if necessary – Carrier 17/19EX User Manual

Page 159

Advertising
background image

If surge prevention occurs too soon or too late:

Modify Equipment Configuration If Necessary

The Equipment Configuration table has tables to select and view or modify. Carrier’s certified

drawings will have the configuration values required for the jobsite. Modify these tables only if

requested.

Config Table Modifications

Change the values in this table per job data. See certified drawings for values. Modifications

include:

chilled water reset

entering chilled water control (Enable/Disable)

4-20 mA demand limit

auto restart option (Enable/Disable)

remote contact option (Enable/Disable)

Load

Surge Prevention Occurs Too Soon

Surge Prevention Occurs Too Late

At low loads (<50%)

Increase P1 by 10 psid (70 kPad)

Decrease P1 by 10 psid (70 kPad)

At high loads (>50%)

Increase P2 by 10 psid (70 kPad)

Decrease P2 by 10 psid (70 kPad)

Advertising