Hot alignment check for open-drive machines, Doweling for open-drive machines – Carrier 17/19EX User Manual

Page 177

Advertising
background image

Hot Alignment Check for Open-Drive Machines

Alignment of compressor with heat exchangers, gear, and driver may be affected by the

operating temperatures of the various components. When all machine components have

reached operating temperature (after running near full load for 4 to 8 hours), make a hot

alignment check.

With the proper equipment and procedure, hot check can be made with either assembled or

disassembled couplings. The procedures are detailed in the Maintenance section.

A clamping tool, Part No. TS-170, is available for checking alignment without disassembling

the couplings. Check with your local Carrier representative.

Doweling for Open-Drive Machines

The size, quantity, and location of dowels vary considerably with type and arrangement of

gear and drive. Check your job data for specific doweling instructions. Typical doweling

practices are described in the

Maintenance

section.

Never operate compressor or drive with coupling guards removed. Serious injury
can result from contact with rotating equipment.

WARNING

!

WARNING

Advertising