Before initial start-up, Job data required, Equipment required – Carrier 17/19EX User Manual

Page 125: Using the utility vessel and pumpout system

Advertising
background image

Before Initial Start-Up

Job Data Required

•

list of applicable design temperatures and pressures (product data submittal)

•

machine certified drawings

•

starting equipment details and wiring diagrams

•

diagrams and instructions for special controls or options

•

17/19EX Installation Instructions

•

pumpout unit instructions

Equipment Required

•

mechanic’s tools (refrigeration)

•

digital volt-ohmmeter (DVM)

•

clamp-on ammeter

•

electronic leak detector

•

absolute pressure manometer or wet-bulb vacuum indicator (

Figure 26

)

•

500 v insulation tester (megohmmeter) for compressor motors with nameplate volt-
age of 600 v or less, or a 5000-v insulation tester for compressor motor rated above
600 v

Using the Utility Vessel and Pumpout System

Refer to

Pumpout and Refrigerant Transfer Procedures

section for: pumpout system

preparation, refrigerant transfer, and machine evacuation.