Before Initial Start-Up

Job Data Required

list of applicable design temperatures and pressures (product data submittal)

machine certified drawings

starting equipment details and wiring diagrams

diagrams and instructions for special controls or options

17/19EX Installation Instructions

pumpout unit instructions

Equipment Required

mechanic’s tools (refrigeration)

digital volt-ohmmeter (DVM)

clamp-on ammeter

electronic leak detector

absolute pressure manometer or wet-bulb vacuum indicator (

Figure 26

)

500 v insulation tester (megohmmeter) for compressor motors with nameplate volt-
age of 600 v or less, or a 5000-v insulation tester for compressor motor rated above
600 v

Using the Utility Vessel and Pumpout System

Refer to

Pumpout and Refrigerant Transfer Procedures

section for: pumpout system

preparation, refrigerant transfer, and machine evacuation.