Initial start-up checklist – Carrier 17/19EX User Manual

Page 426

Advertising
background image

INITIAL START-UP CHECKLIST FOR

17/19EX CENTRIFUGAL LIQUID CHILLER

(Remove and use for job file.)

MACHINE INFORMATION:

NAME

JOB NO.

ADDRESS

MODEL

CITY

STATE

ZIP

S/N

DESIGN CONDITIONS:

TONS

BRINE

FLOW

RATE

TEMPERATURE

IN

TEMPERATURE

OUT

PRESSURE

DROP

PASS

SUCTION

TEMPERATURE

CONDENSER

TEMPERATURE

COOLER

******

CONDENSER

******

COMPRESSOR:

Volts

RLA

OLTA

STARTER:

Mfg

Type

OIL PUMP:

Volts

RLA

OLTA

REFRIGERANT:

Charge

Lbs

CARRIER OBLIGATIONS:

Assemble . . . . . . . . . . . . . . . Yes

No

Leak Test . . . . . . . . . . . . . . . Yes

No

Dehydrate . . . . . . . . . . . . . . . Yes

No

Charging . . . . . . . . . . . . . . . . Yes

No

Alignment . . . . . . . . . . . . . . . Yes

No

Operating Instructions

Hrs.

START-UP TO BE PERFORMED IN ACCORDANCE WITH APPROPRIATE MACHINE START-UP
INSTRUCTIONS

JOB DATA REQUIRED:

1. Machine Installation Instructions . . . . . . . . . . . . . . . . . . . . . . . . . Yes

No

2. Machine Assembly, Wiring and Piping Diagrams . . . . . . . . . . . . Yes

No

3. Starting Equipment Details and Wiring Diagrams . . . . . . . . . . . . Yes

No

4. Applicable Design Data (see above) . . . . . . . . . . . . . . . . . . . . . . Yes

No

5. Diagrams and Instructions for Special Controls . . . . . . . . . . . . . Yes

No

INITIAL MACHINE PRESSURE:

YES

NO

Was Machine Tight?

If Not, Were Leaks Corrected?

Was Machine Dehydrated After Repairs?

CHECK COMPRESSOR OIL LEVEL AND RECORD:

ADD OIL:

Yes

No

Amount:

RECORD PRESSURE DROPS:

Cooler

Condenser

CHARGE REFRIGERANT:

Initial Charge

Final Charge After Trim

Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.

Book 2

2

Tab

5a 5d

PC 211

Catalog No. 531-715

Printed in U.S.A.

Form 17/19EX-1SS

Pg CL-1

9-95

Replaces: 19EX-1SS

Advertising