Inspect wiring – Carrier 17/19EX User Manual

Page 139

Advertising
background image

Inspect Wiring

1. Examine wiring for conformance to job wiring diagrams and to all applicable electrical

codes.

2. On low-voltage compressors (600 v or less) connect voltmeter across the power wires to

the compressor starter and measure the voltage. Compare this reading with the voltage

rating on the compressor and starter nameplates.

3. Compare the ampere rating on the starter nameplate with the compressor nameplate. The

overload trip amps must be 108% to 120% of the rated load amps.

Do not check voltage supply without proper equipment and precautions. Serious
injury may result. Follow power company recommendations.

WARNING

!

WARNING

CAUTION

CAUTION

!

Do not apply any kind of test voltage, even for a rotation check, if the machine is
under a dehydration vacuum. Insulation breakdown and serious damage may
result.

Advertising