Refrigeration log – Carrier 17/19EX User Manual

Page 186

Advertising
background image

fully closed, 100% is fully open. To release the guide vanes to AUTOMATIC mode, press the

RELEASE softkey.

Note: Manual control will increase the guide vanes and override the pulldown rate during start-

up. Motor current above the electrical demand setting, capacity overrides, and chilled

water below control point will override the manual target and close the guide vanes. For

descriptions of capacity overrides and set points, see the

Controls

section.

Refrigeration Log

A refrigeration log, such as the one shown in

Figure 31

, provides a convenient checklist for

routine inspection and maintenance and provides a continuous record of machine performance.

It is an aid in scheduling routine maintenance and in diagnosing machine problems.

Keep a record of the machine pressures, temperatures, and liquid levels on a sheet similar to

that shown. Automatic recording of PIC data is possible through the use of CCN devices such

as the Data Collection module and a Building Supervisor. Contact your Carrier representative

for more information.

Click here for Figure 31 — Refrigeration Log

Advertising