3. Remote Contacts/Ice Level Input — Termination of compressor operation occurs when ICE

BUILD TERMINATION is set to CONTACTS ONLY OPTION and the remote contacts are

open. In this case, the contacts are provided for ice level termination control. The remote

contacts can still be opened and closed to start and stop the chiller when the Ice Build Time

Schedule is UNOCCUPIED. The contacts are used to stop the ICE BUILD mode when the

Ice Build Time Schedule is OCCUPIED.

4. ECW TEMPERATURE and Remote Contacts — Termination of compressor operation shall

occur when ICE BUILD TERMINATION is set to BOTH (temperature and contacts) option

and the previously described conditions for ECW TEMPERATURE and remote contacts

have occurred.

Note: Overriding the CHILLER START/STOP, WATER/BRINE CONTROL POINT, and

ACTIVE DEMAND LIMIT variables by CCN devices (with a priority less than 4) during

the ice build period is not possible. However, overriding can be accomplished with CCN

during two chiller lead/lag.

Return to Non-Ice Build Operations

Upon termination of ice build, the machine shall return to normal temperature control and

start/stop schedule operation. If the CHILLER START/STOP or WATER/BRINE CONTROL

POINT has been forced (with a priority less than 4), prior to entering ice build operation, then

chiller START/STOP and WATER/BRINE CONTROL POINT forces will be removed.