Temperature control during ice build, Termination of ice build – Carrier 17/19EX User Manual

Page 107

Advertising
background image

chilled water flowing. If the entering CHILLED WATER/BRINE TEMPERATURE increases

above the ICE BUILD SETPOINT plus the RECYCLE DELTA T value, the compressor will

restart and control the CHILLED WATER/BRINE TEMPERATURE to the ICE BUILD

SETPOINT.

Temperature Control During Ice Build

During ice build, the capacity control algorithm uses the WATER/BRINE CONTROL POINT

minus 5 F (2.7 C) to control the LEAVING CHILLED WATER temperature. The ECW OPTION

and any temperature reset option are ignored during ice build. The 20 mA DEMAND LIMIT

OPTION is also ignored during ice build.

Termination of Ice Build

Ice build termination occurs under the following conditions:

1. Ice Build Time Schedule — When the Ice Build Time Schedule transitions to

UNOCCUPIED, ice build operation shall terminate.

2. ECW TEMPERATURE — Termination of compressor operation, based on temperature,

shall occur if the ICE BUILD TERMINATION is set to the ICE BUILD TERMINATION TEMP

option and the ENTERING CHILLED WATER temperature is less than the ICE BUILD

SETPOINT. If the ICE BUILD RECYCLE OPTION is set to ENABLE, a recycle shutdown

occurs and recycle start-up shall be based on LEAVING CHILLED WATER temperature

being greater than the WATER/BRINE CONTROL POINT plus RECYCLE DELTA T.

Advertising