Correcting parallel misalignment – Carrier 17/19EX User Manual

Page 215

Advertising
background image

5. Tighten the holddown bolts and recheck the indicator. If the reading has changed, loosen

the three bolts and readjust. It may be necessary to over or undershoot the desired reading

to allow for the effect of bolt tightening.

Correcting Parallel Misalignment

Preparation

— Attach the dial indicator to one shaft or coupling hub and place the indicator

button on the O.D. of the other hub. The reach of the dial from one hub to the other should be

parallel to the shafts, and the dial button shaft should point directly through the center of the

shaft on which it rests. Compress the plunger to about mid-position and set the dial at zero.

Check the tightness of the dial button and the indicator linkage by rotating the shaft to which

the indicator is attached 360 degrees. The dial should return to zero. Check for repeatability.

Check for runout by rotating the hub on which the dial button rests 180 degrees. If the runout

exceeds .001 total indicator reading, the hub should be removed and the shaft checked. Shaft

runout must not exceed .001 TIR.

The effect of hub runout can be eliminated by locating a position on the half coupling where

two readings 180 degrees apart read zero. Rotate the coupling so that one zero point is at the

top and the other at the bottom when checking for misalignment in elevation. Place the zero

Click here for Figure 41 — Adjusting Angular Misalignment in Plan

Advertising